Western Canada Chemical Loading Facility
Description
TWS Industrial Engineering provided coordination, construction support for process piping, electrical controls, alarms and certification of the complete system.
Project Details
TWS Industrial Engineering designed a separate stand-alone central boiler facility for steam heat for the Caustic Soda lines and tanks.
- Loading stations for rail cars and tank trucks.
- Chemicals included Methanol and Caustic Soda.
- Design included the required length of tracks.
- System requirements fulfilled for maximum number of rail cars and tank trucks.